1. Air Drying of Pipes
Air hoses are connected to the piping system. The isolated system is then dried with preheated, filtered air.

2. Corundum Cleaning
The dried pipes are cleaned using an air and sand mixture that sandblasts the inside surface of the pipes. The cleaning process prepares the internal pipe surface for proper bonding of the epoxy.

3. Epoxy Coating Applied
The final stage of the ePIPE process is the application of the epoxy lining to the system. Once the coating is cured the pipes are reassembled, flushed and pressure tested. The finished product provides a "new pipe within a pipe" offering corrosion protection and protecting your water supply from leaching lead and leaks.